Node 001 Launch Dashboard
From concept to deployable readiness. Fabrication, site, operator, and launch milestones — tracked, costed, and stress-tested before public launch.
Node 001 is 29% ready for public launch
Score reflects fabrication, site, operator, and launch milestones. Blocked items must clear before public launch.
Design → Fabrication → Site → Operator → Launch
Every step is owned. Every step has a status. Blocked items must clear before public launch.
Design
1/1 ready- ReadyFinalize Node 001 fabrication layoutLock interior plan + scan-anchor placement before fab cuts.Owner · Founder
Fabrication
1/4 ready- In progressConfirm 10ft container sourcePrefer one-trip 10ft container, A-grade walls.Owner · Fabricator
- ReadyApprove service window + scan zone placementScan panel must be visible from approach path.Owner · Founder
- LockedInstall scan display + NFC/QR panelSub-1 second scan target. Daylight-readable display.Owner · Fabricator
- LockedInstall 6-pan warmer, prep table, undercounter fridgeCommercial-grade equipment package only.Owner · Fabricator
Site
0/3 ready- In progressConfirm power plan: 50A–100A or battery hybridBattery fallback required for outages.Owner · Operator
- In progressConfirm connectivity: 5G router or StarlinkOffline scan sync required.Owner · Operator
- BlockedConfirm site permission and operating scheduleLocal permit + landlord written consent.Owner · Operator
Operator
0/1 ready- LockedTrain first Node StewardUse Node Steward training script v1.Owner · Operator
Launch
0/3 ready- LockedRun closed beta scan testFriends + family scan validation, capsule claim flow.Owner · Founder
- LockedRun soft launchLimited hours, observe queue + scan friction.Owner · Operator
- LockedApprove public launchCouncil reflects, founder approves.Owner · Council
Planning ranges with target lean band
Low and high estimates per category. Lean range targets the bottom 45% of the envelope.
Planning estimates only. Final costs depend on site, sourcing, and permitting. Not a quote, not a commitment, not a financial promise.
Walk the site. Mark what's true on the ground.
Operator-facing checklist. Tap any item once you have walked it and confirmed it in person.
One Node Steward, ten clean steps
Pre-open through closeout. Every step has a system touchpoint and a clear purpose.
- Pre-open system checkT-30 minConfirm node powers up cleanly and connectivity is live.Touchpoint · Node 001 control panel · health endpoint
- Scan panel testT-25 minValidate sub-1 second scan + capsule claim handshake.Touchpoint · Scan-anchor / SoroID handshake
- Food and equipment readiness checkT-20 minWarmer at temp, prep table sanitized, fridge logged.Touchpoint · Equipment log · safety log
- Open glow stateT-0Switch node to public-facing glow; activate scan beacon.Touchpoint · Node beacon · public capsule feed
- First scan validationT+2 minConfirm first user scan is accepted and capsule attached.Touchpoint · Scan log · capsule ledger
- Active service windowT+5 min — T+3h 30mRun service, watch queue, support repeat scanners.Touchpoint · Live operator console
- Capsule claim monitoringContinuousWatch claim conversion and surface friction in real time.Touchpoint · Capsule claim feed
- Inventory checkMid-shiftRestock pans, refresh cold storage, log waste.Touchpoint · Inventory log
- Closeout reportT+3h 50mCapture scans, repeat users, friction notes, incidents.Touchpoint · Steward closeout form
- Offline scan sync checkT+4hFlush any cached offline scans to ledger before lockup.Touchpoint · Offline sync queue
Stress-test demand against capacity
Adjust visitors, conversion, repeat rate, service time, and hours. Bottleneck warning fires when demand exceeds capacity.
Operational simulation only. Not a financial projection. Not a yield. Not a return.
Known risks, named mitigations
Every risk gets a severity, a mitigation, and a status. Nothing hidden.
Multi-agent review of this dashboard
Security, performance, compliance, and architecture agents reflect; founder / steward decides.