Node 001 Deployment Bridge
From planning to real-world deployment. Capture the site, track permits and fabrication, assign the steward, log scan tests, and gate the soft launch — all in one screen.
Cleared. Hold. Or do not deploy.
Aggregates site, permits, fabrication, scan, and steward state into a single soft-launch signal.
- Site capturedPending
- Permits not blocked (all started)Pending
- Fabrication ready (all milestones)Pending
- Latest scan test passingOK
- At least one steward readyBlocked
- Permits confirmedPending
Operational planning tool only. Not legal, financial, or investment guidance.
Capture the real site
Location name, address, notes, and a capture timestamp. Image upload not required — placeholder only.
Track communication, not legal status
Authority, contact status, and notes. This is a coordination log, not a legal record.
- Contact status
- Contact status
- Contact status
- Contact status
Five milestones to a working node
Container · cuts · scan zone · equipment · power. Mark each ready, in-progress, or blocked.
- Container sourced
- Cuts complete
- Scan zone installed
- Equipment installed
- Power setup complete
Name the human on shift
Primary and backup steward, with shift readiness and notes.
- Shift readiness
- Shift readiness
Log every scan dry-run
Date · type (QR / NFC / offline) · result · notes. The latest entry feeds the launch gate.
- Test typeResult